Home > News > Content
Computerized Quilting Sewing Machine Needs To Be Prepared Before Work
Nov 21, 2018

As an automatic machine, Computerized Quilting Sewing Machine needs to be prepared before work, but the preparation of Computerized Quilting Sewing Machine is very different from other automatic machines. Then the Computerized Quilting Sewing Machine is in What preparations do you need to do before you work?


Before using the computer embroidery machine, the correctness of the machine installation must be ensured. The computerized embroidery machine has strict requirements on the installation location of the machine. It must not only be ground and smooth but also ventilated and transparent, and it is not corrosive near the installation point. At the same time, when installing the mainframe, the installation position of the mainframe should be determined according to the production process of the workshop. When installing, ensure that the connection is fixed and the four undercarriage rails are parallel to each other. After the host installation is completed, according to the line mark connection line, special attention should be paid to the connection of the line, because the line is a computer controlled mechanical method, the connection error may cause inoperability, and it is best to follow the instructions when connecting. Before using the computer embroidery machine, the quilting head should be cleaned and refueled, because the machine head will not be refueled at the factory. Moreover, it is better to have a leakage protector during work, and to apply the voltage and power required by the computer quilting machine, to have a reliable grounding, and the frequency converter is separated from the host ground.


Related News

Learn More Information About Our Products Know More
Copyright © Dongguan Chishing Machinery Co.,Ltd All Rights Reserved.